January 2018 – Project PEIR Index
January 2018 – PEIR 0 Front Cover and Contents
January 2018 – PEIR Ch1 Introduction
January 2018 – PEIR Ch2 Regulatory and Policy Background
January 2018 – PEIR Ch3 Project and Site Description
January 2018 – PEIR Ch4 Approach to EIA
January 2018 – PEIR Ch5 Alternatives Considered
January 2018 – PEIR Ch6 Air Quality
January 2018 – PEIR Ch7 Noise and Vibration
January 2018 – PEIR Ch8 Ecology
January 2018 – PEIR Ch9 Water Quality and Resources
January 2018 – PEIR Ch10 Geology, Ground Conditions and Hydrogeology
January 2018 – PEIR Ch11 Landscape and Visual
January 2018 – PEIR Ch12 Traffic, Transport and Access
January 2018 – PEIR Ch13 Historic Environment
January 2018 – PEIR Ch14 Socio-economics
January 2018 – PEIR Ch15 Other Effects Considered
January 2018 – PEIR Ch16 Summary of Residual Effects
January 2018 – PEIR Ch17 Cumulative Effects
January 2018 – APL Figure Front Cover and Contents
January 2018 – Fig 1.1 Project Site Location Plan
January 2018 – Fig 1.2 Project Site
January 2018 – Fig 3.1 Existing Site Levels
January 2018 – Fig 3.2 Indicative Project Layout
January 2018 – Fig 3.3 Access and Rights of Way Plan
January 2018 – Fig 3.4 Existing Utilities Plan
January 2018 – Fig 4.1 Developments to be Considered in Cumulative Assessment
January 2018 – Fig 5.1 Access Route Options
January 2018 – Fig 5.2 Gas Connection Options
January 2018 – Fig 5.3 Opportunity Areas
January 2018 – Fig 6.1 Wind Roses
January 2018 – Fig 6.2 Buildings Modelled
January 2018 – Fig 6.3 Modelled Sensitive Human Receptors
January 2018 – Fig 6.4 Contour Plot of Maximum Annual Mean NO2 Concentrations
January 2018 – Fig 6.5 Contour Plot of Maximum 99.79th Percentile Hourly Mean NO2 Concentrations
January 2018 – Fig 6.6 Contour Plot of Maximum Rolling 8-Hour CO Concentrations
January 2018 – Fig 7.1 Noise Sensitive Receptors Locations and Estimated Sound Levels
January 2018 – Fig 8.1 BSG Ecology 2014 Boundary & 2017 Project Site Boundary
January 2018 – Fig 8.2 Designated Sites 1
January 2018 – Fig 8.3 Designated Sites 2
January 2018 – Fig 8.3 Designated Sites 2 – Corrected and Final
January 2018 – Fig 9.1 Surface Water Bodies
January 2018 – Fig 9.2 Environmental Receptors
January 2018 – Fig 9.3 Bedrock Geology
January 2018 – Fig 9.4 Superficial Geology
January 2018 – Fig 9.5 Groundwater Bodies
January 2018 – Fig 9.6 Potential Pollution Sources
January 2018 – Fig 10.1 UDP Mineral Resources Plan
January 2018 – Fig 10.2 Mine Abandonment Plan
January 2018 – Fig 10.3 Potential Sources of Contamination and Locations of Interest
January 2018 – Fig 11.1 Landscape Designation
January 2018 – Fig 11.2 LANDMAP Aspect Data – Visual and Sensory
January 2018 – Fig 11.3 LANDMAP Aspect Data – Habitat
January 2018 – Fig 11.4 LANDMAP Aspect Data – Geological
January 2018 – Fig 11.5 LANDMAP Aspect Data – Historic
January 2018 – Fig 11.6 LANDMAP Aspect Data – Cultural
January 2018 – Fig 11.7 ZTV and Viewpoints up to 5 km
January 2018 – Fig 11.8 ZTV and Viewpoints up to 15 km
January 2018 – Fig 11.9 ZTV and Visual and Sensory Landmap Aspect Data
January 2018 – Fig 11.10 Outline Landscape Mitigation Strategy
January 2018 – Fig 12.1 Study Area
January 2018 – Fig 12.2 Local Highway Network
January 2018 - Fig 12.3 Traffic Flows 2014 Observed - Weekday AM Peak Hour
January 2018 – Fig 12.4 Traffic Flows 2014 Observed – Weekday PM Peak Hour
January 2018 – Fig 12.5 Traffic Flows 2017 Base Year – Weekday AM Peak Hour
January 2018 – Fig 12.6 Traffic Flows 2017 Base Year – Weekday PM Peak Hour
January 2018 – Fig 12.7 Pedestrian and Cycle Routes and Public Rights of Way
January 2018 – Fig 12.8 Traffic Flows 2020 Baseline – Weekday AM Peak Hour CHECK
January 2018 – Fig 12.9 Traffic Flows 2020 Baseline – Weekday PM Peak Hour CHECK
January 2018 – Fig 12.10 Traffic Flows Project Construction Traffic – Weekday AM Peak Hour
January 2018 – Fig 12.11 Traffic Flows Project Construction Traffic – Weekday PM Peak Hour
January 2018 – Fig 12.12 Traffic Flows 2022 Baseline & Project Construction Traffic – Weekday AM Peak Hour
January 2018 – Fig 12.13 Traffic Flows 2022 Baseline & Project Construction Traffic – Weekday PM Peak Hour
January 2018 – Fig 12.14 Traffic Flows Cumulative Development – Weekday AM Peak Hour
January 2018 – Fig 12.15 Traffic Flows Cumulative Development – Weekday PM Peak Hour
January 2018 – Fig 12.16 Traffic Flows 2022 Baseline Project Const Cum Dev Weekday AM Peak Hour
January 2018 – Fig 12.17 Traffic Flows 2022 Baseline Project Const Cum Dev Weekday PM Peak Hour
January 2018 – Fig 13.1 Historic Assets in the 1 km Study Area
January 2018 – Fig 13.2 Designated Historic Assets in the 5 km Study Area
January 2018 – Fig 14.1 Socio-Economic Study Area
January 2018 – Fig 14.2 Tourism_Business Survey Study Area
January 2018 – Fig 14.3 Community Infrastructure Study Area
January 2018 – Fig 14.4 Tourism Audit
January 2018 – Fig 14.5 Community Infrastructure Audit – Schools
January 2018 – Fig 14.6 Community Infrastructure Audit – GP Surgeries and Hospitals
January 2018 – Fig 14.7 Community Infrastructure Audit – Pharmacies
January 2018 – Fig 14.8 Community Infrastructure Audit – Dentists and Recreation & Arts
January 2018 – Landscape and Visual Photomontages [large file size]
January 2018 – APL Appendices Front Cover and Contents
January 2018 – Appendix 3.1 Outline Construction Environmental Management Plan
January 2018 – Appendix 4.1 Abergelli Scoping Report
January 2018 – Appendix 4.2 Abergelli Scoping Opinion
January 2018 – Appendix 4.3 Consultation Responses
January 2018 – Appendix 5.1 Combined Heat and Power Technical Note
January 2018 – Appendix 6.1 Approach to Air Quality Dispersion Modelling
January 2018 – Appendix 6.2 Stack Height Determination
January 2018 – Appendix 8.1 Preliminary Ecological Appraisal Report NON-CONFIDENTIAL
January 2018 – Fig 8.2 Designated Sites 1
January 2018 – Fig 8.3 Designated Sites 2
January 2018 – Appendix 8.4 Great Crested Newt Survey Report
January 2018 – Appendix 8.5 Reptile Survey Report
January 2018 – Appendix 8.6 Breeding Bird Survey Report
January 2018 – Appendix 8.7 Bat Activity Transect and Roost Survey Report
January 2018 – Appendix 8.8 Bat Survey Report 2014
January 2018 – Appendix 8.9 Dormouse Survey Report
January 2018 – Appendix 8.10 Otter and Water Vole Survey Report
January 2018 – Appendix 8.12 Arboricultural Survey Report 2014
January 2018 – Appendix 8.13 Preliminary Ecological Appraisal 2014
January 2018 – Appendix 8.14 Otter and Water Vole Survey Report 2014
January 2018 – Appendix 8.15 Final Dormouse Survey Report 2014
January 2018 – Appendix 8.16 Breeding Bird Survey Report 2014
January 2018 – Appendix 8.17 Great Crested Newt Survey Report 2014
January 2018 – Appendix 8.18 Reptiles Survey Report 2014
January 2018 – Appendix 8.19 Invasive Plant Species Survey Report
January 2018 – Appendix 9.1 Flood Consequence Assessment
January 2018 – Appendix 9.2 Water Framework Directive Assessment
January 2018 – Appendix 10.1 Preliminary Geo-Environmental Risk Assessment 2015
January 2018 – Appendix 10.2 Landmark Information Group Envirocheck
January 2018 – Appendix 10.3 BGS Borehole Log SN65200160
January 2018 – Appendix 10.4 Coal Authority Mining Report
January 2018 – Appendix 11.1 Summary of LANDMAP Aspect Data
January 2018 – Appendix 11.2 Assessment of Landscape Effects
January 2018 – Appendix 11.3 Assessment of Visual Effects
January 2018 – Appendix 12.1 Traffic Survey Data
January 2018 – Appendix 12.2 Capacity Assessment Output Report
January 2018 – Appendix 13.1 Gazetteer of Historic Assets
January 2018 – Appendix 14.1 Socio-Economic Technical Baseline
January 2018 – Appendix 14.2 Tourism Business Survey
January 2018 – Appendix 14.3 Community Infrastructure Audit