The pre-application consultation for the Abergelli Power Gas and Electrical Connections has now closed. Abergelli Power will have regard to all the consultation responses received in finalising the application documentation, and a Pre-application Consultation (PAC) Report will be submitted with both applications in due course.
Please find links to the draft Town and Country Planning Application documents below.
1. Electrical Connection Town and Country Planning Application documents
Electrical Connection Enviornmental Report
Electrical Connection Planning and Design Access Statement (PDAS)
Electrical Connection Site Layout Plan
Electrical Connection Site Location Plan
Draft Electrical Connection Application Form
Electrical Connection Enviornmental Report Appendices part 1 of 2
Electrical Connection Enviornmental Report Appendices part 2 of 2